Tool Upgrade Documentation
Objective: Upgrade the existing tools and technologies to the latest versions and configure them appropriately.
Activities Performed:
- Database Backup:
- Duration: 2 hours
- Description: Backup of the current database to ensure no data loss during the upgrade process.
- Uninstallation of Previous Versions:
- Java 1.8
- MySQL 5.7
- Redis
- WildFly 11
- Duration: 40 minutes
- Tools Uninstalled:
- Installation of New Versions:
- JDK 17
- MySQL 8.0
- Redis 5
- WildFly 30
- Duration: 1 hour 15 minutes
- Paths for all Tools
Wildfly30 – E:\uat_new\wildfly-30.0.0.Final\wildfly-30.0.0.Final
Redis5 – C:\Program Files\Redis
Java17 – C:\Program Files\Java\jdk-17.0.3.1
MySQL8 – F:\MYSQL8\MySQL\MySQL Server 8.0
- Paths for all Tools
- Database Schema Configuration changes:
- Duration: 2 hours
- Description:
Before tacking the backup we have made changes in db schema to make compatible with MySQL 8.0. Changes are mentioned here:
- While restoring latest backup need to replace NO_AUTO_CREATE_USER in db routines
- Keep sql_mode in my.ini config file (MySQL 8)
sql_mode='STRICT_TRANS_TABLES,NO_ZERO_IN_DATE,NO_ZERO_DATE,ERROR_FOR_DIVISION_BY_ZERO,NO_ENGINE_SUBSTITUTION'; |
3. As part of testing done below datatype change (MySQL 8) alter table db_iemr.t_phy_anthropometry modify BMI decimal(7,3); 4. Reserved keywords would be changed to MySQL supported columns. ex: system, value etc.(identified in Pr_Practioner sp) |
...
- Database Restoration:
- Duration: 2 hours
- Description: Restored the database from the backup created earlier.
- Creation of Database Users:
- Description: Created necessary database users with required privileges for operational needs.
- Configuration of WildFly:
- Description: Set up WildFly paths for Java and MySQL to ensure proper integration and functionality.
- Creation of Shortcuts:
- Description: Created necessary shortcuts on the desktop for quick access to the newly installed tools.
Summary of Time Spent:
- Database Backup: 2 hours
- Uninstallation: 45 minutes
- Installation: 1 hour
- Database Restoration: 2 hours
- Configuration and Setup: 2 hours
- Total Time: 7 Hours 45 Minutes
Next Steps:
- Verification:
- Ensure all tools are functioning as expected.
- Verify database integrity and user access.
- Testing:
- Conduct thorough testing of the upgraded tools and configurations.
- Confirm that all integrations and functionalities are operational.
- Documentation:
- Installation guide added